Design, Manufacturing, Supply, Installation, Construction & Commissioning of BQPS RLNG Spur Pipeline Project
Client: | K-Electric |
Duration: | 07 Months |
Value: | USD 1 millions |
Executed year: | 2020 |
Scope of work:
|
· Design
· Manufacturing · Supply · Installation · Engineering · Equipment & Material Supplies · Construction · Commissioning |
Procured Equipments | · Line Pipe
· Piping & Fittings (including 5D bends · Emergency Shutdown Valves (ESDVs) · Flow Control Valve (FCV) · Pressure Switches · Restriction Orifice (RO) · Flow Transmitter (FT) · Instrument Cables · Cable Glands · Cable Trays and Conduits · Tubing and Fittings · Junction Boxes · Cathodic Protection System items · Cable Lugs |