ENGRO Fertilisers Company Limited, Pakistan
Year: 2015
Execution Time 30 days
Compressor Installation Works 3 Compressors, 7,950 Hp – 150 Mmscfd Lifting And Installation Inter-skid Piping Inter-skid Instrumentation & Electrical Package Works Compressor Cylinder Installation Engine
Installation Suction & Discharge Bottles
Installation Scubbers Installation Mechanical Works Piping Fabrication & Welding Structure Fabrication & Welding Electrical Works Earthing Works, Cable Laying Panel Terminations, Loop Testing & Verification Instrumentation Works Field Instruments Control Panel Loop Testing, Verifications Etc Equipment Erection Compressor / Engine Skid Cooler Commissioning Pre-commissioning Checks & Verification Commissioning, Start-up & Performance- Testing